How to Find Which PCS 7 Template PDL Supplies a Block Icon

How to Find Which PCS 7 Template PDL Supplies a Block Icon

To find the template used for an automatically generated PCS 7 block icon, inspect the OS project's GraCS folder and sort @PCS7Typicals*.pdl files in reverse alphabetical order. The PCS 7 Operator Station V9.1 SP1 manual says the first template in that order containing a matching block icon is used by Create/Update Block Icons. If OpDi01/100 is absent from every template, it may have been copied into a picture manually rather than generated from a template.

Table of Contents

Search the template files

  1. Open the OS project's GraCS folder and list files matching @PCS7Typicals*.pdl.
  2. Sort filenames in reverse alphabetical order.
  3. Inspect the template pictures in that order for an object whose Type matches the icon variant, such as OpDi01/100.
  4. The first matching template is the one Siemens documents as the source used by Create/Update Block Icons.
  5. Back up the project before editing templates or regenerating icons.

If the icon is not in a template

An icon visible in a process picture is not necessarily template-generated. It may have been copied from another project and connected manually or through a Dynamic Wizard. Siemens' search procedure identifies icons present in template PDL files; if the object is missing from them, inspect the actual process picture and object properties.

Interpret OpDi01/100 carefully

The Type value identifies an icon type/variant in the project context. It does not name the PDL file. The ticket found OpDi01/100 in use while locating only variants 01 through 04 in templates; this is consistent with a custom or copied object, but inspection of the project files is needed to establish its origin.

Regeneration precautions

PCS 7 can update picture objects from available template files. Before running this operation, archive the OS and verify the template ordering and project-specific icons because the operation can update generated graphics.

Limitations and Operational Precautions

Confirm version applicability and operational impact before changes to a running control system. Use approved backup, testing, change-control and rollback procedures.

Verification

Verify configuration and observable runtime behavior against the intended process requirements.

Engineer FAQ

How are PCS 7 OS areas created? PCS 7 derives OS areas from the configured picture hierarchy; the PCS 7 V9.0 manual maps the second Picture Tree Manager level to OS areas for user rights.

Can a client create its own unrelated area hierarchy? The OS client editor configures visible areas and rights from the OS picture structure; it does not replace the engineering hierarchy as the source.

What does an empty CSV export prove? Only that the generated file has headings but no rows; it does not reveal whether the cause is filtering, project data, or an export defect.

Can an installer compatibility bypass establish support? No. A successful setup launch does not prove that a software and operating-system pairing is tested or supported.

Does PCS 7 V8 license entitlement automatically cover V9? The applicable license and upgrade entitlement must be checked for the exact product and contract; do not infer it from version numbering.

Does local mode bypass all motor stops? No. Mode selection and interlocks or stop inputs are separate logic conditions; inspect the exact block version and signal states.

How does PCS 7 treat cyclic interrupt process images? A process image partition assigned to a cyclic interrupt OB is updated when that OB runs; without such assignment, the regular OB1 update may leave cyclic logic using older values.

Can several PDL pictures appear in one WinCC screen? Yes. WinCC picture-window objects can display project PDL files; PCS 7 APG V9.0 SP2 also documents a four-quadrant display.

Should APG Quad Screen be assumed present in every project? No. Confirm the installed APG release and compatibility with the project's PCS 7 and APL versions.

When should an issue be escalated? Provide exact product versions, project context, reproducible steps, and relevant logs or configuration evidence with private details removed.

Technical References

Related Articles

Related Tags

17 respuestas